Tuesday, June 28, 2011

Mr. Cranky

Simple job tonight.  Drill out and fit together two halves of the forward elevator bellcrank.  Two undrilled plates of anodized aluminum and a pre-drilled bearing housing.  The plans say the pre-drilled holes are #40 but they were actually #30 which is the final size too.  Drilled one half the backdrilled the other half and primed with zinc chromate and assembled with painted CherryMax rivets.  Voila!


This is the last of the controls for now.  Time to get back on the skins.

No comments:

Post a Comment